不同顶管组合方式的管幕冻结温度场模型试验 |
段寅, 荣传新, 程桦, 蔡海兵, 解德柱, 丁杨龙 |
Model test of freezing temperature field of the freeze-sealing pipe roof method under different pipe arrangements |
Yin DUAN, Chuanxin RONG, Hua CHENG, Haibing CAI, Dezhu XIE, Yanglong DING |
图8 积极冻结期各试验区顶管间测点温度-时间曲线 |
Fig.8 The temperature-time curves of the monitoring points between pipes in active freezing period |
![]() |