青藏铁路填土路基热-力耦合离散元研究 |
| 石梁宏, 李双洋, 尹楠 |
|
Study on thermal-mechanical coupling of the Qinghai-Tibet Railway embankment based on discrete element method |
| Lianghong SHI, Shuangyang LI, Nan YIN |
| 图8 路基建成后第20年的地温分布 |
| Fig.8 Distributions of ground temperature of the embankment in four typical seasons in the 20th service year |
|