基于MODIS数据的额尔齐斯河上游河冰物候研究
|
Study on river ice phenology of upper Irtysh River with MODIS data
|
图7. 开始封河时间与结束开河时间变化趋势(纵轴表示每一年的第几天) |
Fig.7. The change trend of river freezing time and river breaking time (The vertical axis represents the day of each year), [The change of river break-up time (a), the change of river freeze-up time (b)] |
![]() |