列车荷载下冻土路基非平稳随机振动分析的时域显式法
|
Non-stationary random vibration analysis of railway embankments in permafrost regions under train loads using the explicit time-domain method
|
图6. 路基1#点竖向动力响应时程(夏季) |
Fig. 6. Time histories of dynamic responses at point 1# (Summer): time history of vertical displacement (a), time history of vertical velocity (b), time history of vertical normal stress (c) |
![]() |