冻土区输电线路桩基础抗拔承载特性数值模拟研究
袁俊, 赵杰, 唐冲, 甘仁钧

Numerical analyses of uplift behavior of pile foundation for transmission line structure in frozen soil regions
Jun YUAN, Jie ZHAO, Chong TANG, Renjun GAN
表3 多年冻土区粉质黏土、砾砂地基中桩基础抗拔系数
Table 3 Anti-uplift coefficient for pile foundation in silty clay and gravelly sand in permafrost regions
地基土工况活动层厚度/m抗拔承载力/kN抗压承载力/kN抗拔系数λi
粉质黏土冻结期2 5552 5671.00
融化期1.52 3262 4830.94
2.02 1582 3500.92
2.51 9812 1740.91
3.01 7931 9900.90
砾砂冻结期2 9523 1760.93
融化期1.52 5632 9580.87
2.02 3662 7670.85
3.02 1472 5700.84
4.01 9902 3960.83