输电线路掏挖基础机械成孔过程中孔壁土体稳定性分析

崔强, 何西伟, 曹丹京, 苏鼎, 徐震

冰川冻土 ›› 2016, Vol. 38 ›› Issue (4) : 922-928.

PDF(3950 KB)
PDF(3950 KB)
冰川冻土 ›› 2016, Vol. 38 ›› Issue (4) : 922-928. DOI: 10.7522/j.issn.1000-0240.2016.0105
岩土工程重大工程实例

输电线路掏挖基础机械成孔过程中孔壁土体稳定性分析

    {{javascript:window.custom_author_cn_index=0;}}
  • {{article.zuoZhe_CN}}
作者信息 +

Stability analysis of borehole wall of digged foundation of transmission line during mechanized drilling

    {{javascript:window.custom_author_en_index=0;}}
  • {{article.zuoZhe_EN}}
Author information +
文章历史 +

本文亮点

{{article.keyPoints_cn}}

HeighLight

{{article.keyPoints_en}}

摘要

{{article.zhaiyao_cn}}

Abstract

{{article.zhaiyao_en}}

关键词

Key words

本文二维码

引用本文

导出引用
{{article.zuoZheCn_L}}. {{article.title_cn}}[J]. {{journal.qiKanMingCheng_CN}}, 2016, 38(4): 922-928 https://doi.org/10.7522/j.issn.1000-0240.2016.0105
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2016, 38(4): 922-928 https://doi.org/10.7522/j.issn.1000-0240.2016.0105
中图分类号:

参考文献

参考文献

{{article.reference}}

基金

版权

{{article.copyrightStatement_cn}}
{{article.copyrightLicense_cn}}
PDF(3950 KB)

Accesses

Citation

Detail

段落导航
相关文章

/